Skip to main content
London Borough of Southwark

Article 4 direction: Site allocation NSP76: Land between the railway arches (east of Rye Lane including railway arches) 76

Site allocation NSP76: Land between the railway arches (east of Rye Lane including railway arches) 76

description
76
entry-date
2025-05-21
name
Site allocation NSP76: Land between the railway arches (east of Rye Lane including railway arches)
reference
76
start-date
end-date
notes
Demolition of commercial buildings and replacement with a single dwelling housing or block of flats is restricted
organisation
prefix
article-4-direction