Skip to main content
London Borough of Southwark

Article 4 direction area: Site allocation NSP01: Aylesbury Phase 1 8

Legend

  • London Borough of Southwark boundary
  • Article 4 direction areas

Site allocation NSP01: Aylesbury Phase 1 8

description
8
reference
8
notes
Demolition of commercial buildings and replacement with a single dwelling housing or block of flats is restricted
geometry
MULTIPOLYGON (((-0.092063 51.483914,-0.092138 51.483920,-0.092063...
name
Site allocation NSP01: Aylesbury Phase 1
start-date
article-4-direction
8
end-date
entry-date
2025-05-21
permitted-development-rights
None given
documentation-url
ADDRESS1, ADDRESS2, ADDRESS3, POSTCODE
point
POINT (-0.090255 51.48355)
address-texts
uprn
uprns