Skip to main content
Blackpool Borough Council

Article 4 direction area table

Legend

  • Blackpool Borough Council boundary
  • Article 4 direction areas
name start-date geometry article-4-direction end-date entry-date notes permitted-development-rights reference description address-texts point uprns documentation-url uprn ADDRESS1, ADDRESS2, ADDRESS3, POSTCODE
Article 4 Direction - C3 to C4 HMO 2022-10-03 MULTIPOLYGON (((-3.069372 53.811297,-3.069422 53.811108,-3.069702... Bpl_A4Da1 2026-03-10 3L Bpl_A4Da1 Removes the right for the change of use of a C3 (dwellinghouse) to a C4 (HMO) POINT (-3.035525 53.817692)
Article 4 Direction - Locally Listed buildings 2023-02-24 MULTIPOLYGON (((-3.069372 53.811297,-3.069422 53.811108,-3.069702... Bpl_A4Da2 2026-03-10 2C;11B Bpl_A4Da2 Removes the rights the applicaton of paint and the demolition of buildings POINT (-3.035525 53.817692)
Article 4 Direction - Conservation Area (Stanley Park) - Part 1 2013-10-08 MULTIPOLYGON (((-3.031562 53.816403,-3.031923 53.816360,-3.031863... Bpl_A4Da3 2014-04-07 2026-03-10 1A;1D;2A;2C;11B Bpl_A4Da3 Removes the rights for domestic extensions including porches; demolition; erection, alteration or demolition of boundary treatments; and exterior painting, POINT (-3.023432 53.815106)
Article 4 Direction - Conservation Area (Stanley Park) - Part 2 2014-09-04 MULTIPOLYGON (((-3.031562 53.816403,-3.031923 53.816360,-3.031863... Bpl_A4Da4 2026-03-10 1B;1C;1E;1F;1G;2D;2E Bpl_A4Da4 Removes the rights for extensions and alterations to roofs; erection of buildings or containers within the curtilage; provision of hard-surfacing; installation of antenna, chimneys, EV chargers, renewable energy aparatus or CCTV. POINT (-3.023432 53.815106)
Article 4 Direction - Conservation Area (Raikes Hall) 2020-06-01 MULTIPOLYGON (((-3.032294 53.817381,-3.033189 53.818779,-3.033722... Bpl_A4Da5 2026-03-10 1A;1B;1C;1D;1E;1F;1G;1H;2A;2B;2C;2D;2E;2F;11B;11C;14A;14B;14C;14D;14E;14F;14G;14H;14I;14K;14L Bpl_A4Da5 Removes the rights for domestic extensions including porches; extensions and alterations to roofs; erection, alteration or demolition of boundary treatments; erection of buildings or containers within the curtilage; formation of an access; provision of hard-surfacing; installation of antenna, chimneys, EV chargers, renewable energy or microgeneration aparatus, flues or CCTV; and exterior painting, POINT (-3.03956 53.81675)
Article 4 Direction - Promenade 1949-02-15 MULTIPOLYGON (((-3.048806 53.874339,-3.048868 53.873726,-3.049120... Bpl_A4Da6 2026-03-10 4B Bpl_A4Da6 Removes the rights for the temporary use of land POINT (-3.055736 53.819583)